
Category: Facility Upgrades
January 28, 2025 Shortly after school began in the fall of 2024, we faced an emergency water shortage when our main campus well pump failed unexpectedly. This critical water source
January 28, 2025 Due to the high cost of maintaining an aging activity bus we recided to replace our bus with two lower mileage vehicles that can hold at least
January 29, 2024 Over two years, we raised the funds needed to replace our lower school playground. The new, larger playground for our growing student body includes a giant climbing
When the pandemic forced us to close our student snack shop, then located on the ground floor of the Classroom building (former pig sty!), we realized how important this space
A new preschool and kindergarten playground was the first project in a multi-year effort to revitalize our play spaces and recreational areas. We believe children benefit educationally and socially when
The growth we experienced after the pandemic allowed us to add two new classroom on the ground floor of the Classroom building in what used to be the student snack
January 22, 2020 In 2020, we worked hard to improve our energy efficiency. We took on three small projects that together reduced our energy costs by $9,000 per year.Part 1
Search
Categories
Archives
Recent Posts


2026 Annual Fund Update

Home Away From Home: DCA’s Dorm Ministry
In this blog, we dive into an important part of DCA’s HIstory – the Dorm Ministry.

2026 Annual Fund Update
This article will focus on the big things we provide for our smallest students: from a comprehensive curriculum to fun and educational field trips, and the different program options we offer families.
