Capital Improvements
Dublin Christian Academy has been blessed with a beautiful historic campus, and maintaining these century-old buildings requires thoughtful care and ongoing upgrades. Guided by our capital committee, we focus on essential restoration and maintenance projects that protect our facilities, strengthen our campus, and support our mission. This page highlights key improvements made possible through the generosity of our community.
We repaired the historic chimneys on the Main House in April 2026 as part of our deferred maintenance plan. We contracted with Jewell Masonry to make sure these chimneys honor
During Winter Bible Conference, our facilities staff discovered a break in a waer line that provides water to faculty housing. With the help of David O'Neil Construction, we were able
As we enter the heart of the autumn season, we are constantly reminded of the beautiful property that we call home.
Shortly after school began in the fall of 2024, we faced an emergency water shortage when our main campus well pump failed unexpectedly. This critical water source provides water to
Due to the high cost of maintaining an aging activity bus we recided to replace our bus with two lower mileage vehicles that can hold at least 14 passengers each.
Over two years, we raised the funds needed to replace our lower school playground. The new, larger playground for our growing student body includes a giant climbing dome, slide, eight

